Saturday, January 31, 2015
Im running out of places to stack my tools
I actually have decided to some time soon make a list of things I need to complete in order to launch. Lots of little things have been getting completed along with some big ticket items. I can officially say my bilge pumps are wired, and I have the picture to prove it. I guess I should clarify this a little and admit that two of the three pumps are wired. The engine room bilge pump along with the pump in the cabin area are complete. The pump in the lazzarette is not wired because its not purchased. The two pumps I have wired are big pumps being Rule 3500s. I had to wire these off the the battery switch panel as these breakers are always hot even if the house bank is turned off. I did have to install 25 amp breakers for each one of these pumps. Using #10 wire, I wired these two pumps to the wheel house so I could see when and if they come on. A pump control panel seemed to make sense and the Sea Dog panel appears to be what I was looking for. The panel has a manual and auto mode along with having an audible and visual alarm. If the switch is inadvertently left in the off position, and water rises up to the alarm float, the alarm float along with alarming, will turn the pump on.
We have a few intake and exhaust pipes I had to deal with in regard to insect screens. Using a slice of PVC schedule 40 and cross cutting the slice creates an internal clip that works great holding screen in. Youll have to fool around with how much to remove from the slice,but when youre finished, it gives a nice clean look thats easy to get in and out, holds the screen great, and doesnt corrode.
Because the finished flooring is now complete, we were able to move in the reclining love seat. Ive been on too many boats that did not have at least one comfortable seat, and I for sure did not want our boat to be one of those. The recliner sort of buries the book case, but you can still get to the shelves, and thats a small price to pay for a super comfy place to sit.
We decided to go with an under mount sink, and Im glad we did for the one reason of being able to fabricate a cutting board that will fit exactly in the sink.
As Ive said before, in order to do this boat launch thing the right way, more time is needed on my part to make this launch happen. I keep going back to needing about another year. If we put off the launch to much longer, were at the end of the summer, and at that point we should just keep her at Washington and finish her up righteous over the Winter. It sure would be nice to have her in the water being 100% complete with nothing left to do... I mean its only time, right?
Cheers
Subscribe to: